CHENIERE LNG / SABINE PASS LIQUEFACTION
Port Arthur, Texas / Cameron Parish, Louisiana
AWC was approached by Cheniere Energy Partners of Houston, Texas to assist them in developing an improved potable water delivery system for their LNG facility in Cameron Parish Louisiana.
Upon completion of a Citywide Water System Hydraulic Model, we recommended a robust level of improvements including a 20 mgd upgrade to the surface water treatment plant, 2.5 million gallon elevated storage tank, and 21 miles of 16-inch and 24-inch diameter transmission mains. One segment of the 24-inch main needed to cross the US Army Corps of Engineers Hurricane Protection Levee and the planned 48 feet deep Sabine-Neches Canal. AWC designed all facilities and managed the construction of improvements. The total cost for the infrastructure program is approximately $100 Million.