24
JUN
2016

CPA-875 19TH STREET WATER PLANT DEMOLITION

Posted By :
Comments : Off

Bid Opening will be
Wednesday June 29, 2016 at 3:15 PM

 

Please click here to download the Bid Advertisement for the 19th Street Water Plant Demolition.

Please click here to download the Plans, Specifications, and Contract Documents for the 19th Street Water Plant Demolition.

Please click here to download the ADDENDUM #1 for the 19th Street Water Plant Demolition.

Please click here to download the ADDENDUM #2 for the 19th Street Water Plant Demolition.

Please click here to download the ADDENDUM #3 for the 19th Street Water Plant Demolition.

Project Description
Contractor shall be responsible for performing all work indicated in the Construction Plans, which include but are not limited to the following: demolition; management, removal, and disposal of wastes (hazardous and non-hazardous); abatement; protection of sensitive utilities; storm sewer; sanitary sewer; waterlines; site grading; hydro-mulch; and installation of new fencing. Contractor shall provide Storm Water Pollution Prevention Plan (SWP3). Contractor shall provide safety measures to protect the public, the work, and any temporary onsite facilities. Contractor must comply with the recommendation specified in the Phase II Environmental Site Assessment (Appendix “k”) and the Asbestos and Lead-Based Paint Technical Specifications (Appendix “I”).

 

Please click the links above to download the documents relevant to this project. If you have any questions, please contact our office.

 

Arceneaux Wilson & Cole LLC
2901 Turtle Creek Drive
Suite 320
Port Arthur, TX 77642
inquiries@awceng.com
(409) 724-7888